Property law
What a Spanish Nota Simple Doesn't Tell You — Check This Before You Sign

What the Land Registry Actually Certifies — and What It Does Not
Every English-language guide to buying in Spain tells you the same thing: get a nota simple. The advice is correct and almost nobody explains its limits, which is where the money is lost.
A nota simple is an extract from the Land Registry. It tells you who the registered owner is, how the property is described, and what charges sit on it — mortgages, seizures, easements, rights of way. On those points the Registry carries real legal weight, and article 34 of the Mortgage Act protects a buyer who acquires in good faith from a registered owner. That protection is genuine, and it is the reason the Spanish system works.
But it protects you against defects in title. It does not protect you against the town hall. Planning legality is administrative law, and the Registry is not the body that certifies it. A property can be perfectly registered, mortgage-free, owned outright by the person selling it to you, and still contain a swimming pool, a terrace, a guest annex or a converted basement that the local authority never authorised.
British buyers in particular find this counterintuitive, because HM Land Registry sits inside a system where building control and title tend to surface together in conveyancing searches. In Spain they are two separate worlds, held by two separate administrations, and only one of them issues the nota simple.
How an Unauthorised Building Ends Up Legitimately Registered
The article 28.4 route
Spanish law provides an ordinary route to registering a new building, which requires the planning licence and the certificate of completion. It also provides an exceptional route, in article 28.4 of the Land Law, for constructions against which the authorities can no longer take restoration measures involving demolition, because the applicable limitation period has run out.
Under that route the owner does not produce a licence. He produces proof of age: a municipal certificate, a technical certificate from an architect, a notarial description of the property, or — most commonly in practice — a cadastral certificate showing the year of construction. The registrar then registers the building and notifies the town hall.
The marginal note that is supposed to follow, and often doesn't
The law anticipates the obvious risk. Once notified, the town hall is required to issue a decision recording, by marginal note against the registration, the actual planning status of that building and the specific limitations it imposes on the owner. If the town hall omits that note and a subsequent buyer suffers financial loss, the law makes the administration liable.
That is the theory. In practice these notes are frequently missing, years late, or recorded against one building on a plot but not another. A clean nota simple may therefore mean the building is compliant — or it may mean nobody at the town hall ever got round to writing down that it is not.
What "the period has expired" really depends on
Here is the part that catches foreign buyers hardest, and it is the reason a purely national rule of thumb is dangerous. The limitation period for planning enforcement is not set by Spanish national law. It is set by each of the seventeen autonomous regions, and it varies. Andalucía, Valencia, Catalunya, the Balearics and Galicia do not all apply the same period, and several regions have amended theirs in recent years.
More importantly, on certain categories of land — specially protected rural land, public domain, green zones, coastal easement areas — the enforcement action commonly does not expire at all. On that land, "it was built twenty years ago" is not a defence. It is simply a description of how long the problem has been waiting.
What You Inherit When You Sign
Article 27.1 of the Land Law is short and unforgiving. The transfer of a property does not alter the owner's position regarding planning duties: the new owner is subrogated into the rights and duties of the previous one. The seller's planning problem does not stay with the seller. It walks across the notary's desk with the deed.
| What you find after completion | Practical consequence | Severity |
|---|---|---|
| Extension registered under art. 28.4, later declared outside planning ("fuera de ordenación") | You may maintain and repair it. You generally may not extend or substantially improve it. Resale value is affected permanently | Medium |
| Unauthorised works on specially protected or rustic land where enforcement does not expire | Demolition order remains possible indefinitely, at your cost, plus repeatable coercive fines | High |
| Open planning enforcement file not yet noted on the Registry | You inherit the file. Proceedings continue against you as current owner | High |
| Cadastre shows a pool or annex that the Registry does not | Usually the fingerprint of unregistered and often unlicensed works. Also a tax exposure, since the cadastre drives your annual IBI | Medium |
| No first-occupation licence for part of the property | Utility connections, mortgage approval and any tourist-rental registration can all fail on this single document | High |
| Registered surface smaller than what you were shown | You are buying, and paying tax on, a property that legally is smaller than the one you viewed | Medium |
What This Costs in Real Numbers
Take a villa at €1,200,000. The listing describes 320 square metres. The nota simple describes 240. The difference is an 80-square-metre guest annex built in 2013, registered by age in 2020 under article 28.4, and sitting on protected rural land.
You buy it. Two years later the town hall opens a restoration file. Because of the land classification, the enforcement action never expired. Demolition of the annex, including the technical project, the works and the reinstatement, runs to somewhere between €40,000 and €70,000 depending on the region and the structure. Coercive fines can be imposed repeatedly while you fail to comply. And the property you paid for at 320 square metres is now a 240-square-metre property, in a market that prices by the metre.
The whole exposure was visible before signing, in a document that costs a few euros and a letter to the town hall that costs nothing but time. What made it invisible was the pace of the transaction — and pace is exactly what a deposit contract is designed to create. If you have already signed one, read this alongside our note on what happens to your deposit when a buyer pulls out.
The Four Documents Nobody Asks the Seller For
The nota simple is the beginning of due diligence, not the end of it. Four documents, all obtainable before you commit, close most of the gap. None of them requires you to be in Spain.
First, a planning certificate from the town hall — the cédula urbanística or equivalent — stating the land classification, the permitted use and what may lawfully be built. Second, a certificate confirming the absence of any open planning enforcement file against the property. Third, the original building licence and the first-occupation licence, for the whole property and for every subsequent extension. Fourth, the graphic cadastral certificate, read side by side with the registered description so that the discrepancies between the two are on the table before you sign rather than after.
If the seller cannot produce the second and third, that is not an administrative inconvenience. It is the finding.
If You Have Already Bought
The position is worse but not hopeless. Spanish law gives a buyer remedies against a seller who conceals defects, and where the concealment was deliberate the seller's liability is wider than most sellers expect. The difficulty is time: the general limitation period for hidden defects in a sale is short, and it starts running from delivery, not from the day you find out. We cover that clock in detail in our note on hidden defects and the six-month deadline.
Separately, a legalisation route sometimes exists — where the works could have been authorised and simply were not, retrospective legalisation may be possible. Whether it is depends on the land classification and the current municipal plan, and it is the first thing to establish, because it determines whether you are dealing with a paperwork problem or a demolition problem.
José Ángel Soria — How I Can Help You
I am a Spanish lawyer registered with the Balearic Bar (ICAIB 5971), and I work in English with owners and buyers across Spain, not only in Mallorca. My background includes investment banking, in derivatives, at Goldman Sachs (New York) and Deutsche Bank (London), and a spell at American Express (Madrid). Everything here can be handled remotely: I take instructions by video call, obtain the municipal documentation myself, and can act under a power of attorney so that you never need to fly over for a signature. If you are about to sign a deposit contract, or you have already bought and something in the paperwork does not add up, the useful moment to talk is now.
Book a 30-Minute Consultation30-minute initial consultation: €200, VAT included.
You pay when you book, by card (Stripe), in the Cal.com calendar. You get an invoice. If I cannot take your matter, I refund the amount. How we use your data: privacy policy.
Frequently Asked Questions
Does a clean nota simple mean the property is legal?
No. It means the ownership and the registered charges are clear. Planning legality is a separate matter held by the local authority, not by the Land Registry. Under article 28.4 of the Land Law a building can be registered without ever having had a licence, on proof of age alone, once the authority's enforcement window has closed. The registration is valid and the building may still be non-compliant. You need a municipal certificate, not only a registry extract.
If the works are old, is the problem time-barred?
Sometimes, and it depends entirely on where the property sits. The limitation period for planning enforcement is set by each autonomous region, not by national law, and the periods differ. On specially protected land, public domain, green zones and coastal easement areas, the action generally does not expire at all. On that land, age gives you no protection whatsoever. Establishing the land classification is therefore the first check, not a technical detail to confirm later.
Am I responsible for planning breaches committed by the previous owner?
Yes, as owner. Article 27.1 of the Land Law provides that the transfer of a property does not change the owner's position regarding planning duties, and that the new owner is subrogated into the rights and duties of the previous one. The administration acts against whoever owns the property now. You may have a separate claim against the seller who concealed the situation, but that is a civil action between the two of you and it does not suspend the town hall's file.
The cadastre and the Land Registry describe my property differently. Does it matter?
It matters a great deal. The cadastre records physical reality for tax purposes; the Registry records legal title. When the cadastre shows a pool, a terrace or an annex that the Registry does not, the usual explanation is that works were carried out and never regularised. It is also a live tax question, because the cadastral value drives your annual IBI. The discrepancy should be explained and resolved before completion, not after.
Can all of this be checked without travelling to Spain?
Yes, and in practice most of it is. The nota simple, the cadastral certificate and the municipal certificates can be requested remotely by your lawyer. Instructions and reporting work perfectly well by video call. If you also grant a power of attorney — signed before a notary in your own country and apostilled — your lawyer can sign the deposit contract and the deed on your behalf. Many purchases by non-resident buyers are completed without the buyer setting foot in Spain.
What if I have already completed and the problem only surfaced afterwards?
Move quickly, because the clock is the main enemy. Spanish law gives a buyer remedies against a seller for hidden defects, and wider remedies where the seller concealed the problem deliberately, but the ordinary limitation period is short and runs from delivery rather than from discovery. In parallel, establish whether the works can be legalised retrospectively under the current municipal plan. That single answer determines whether you are facing a paperwork exercise or a demolition.
Sources consulted for this article:
Real Decreto Legislativo 7/2015, de 30 de octubre, texto refundido de la Ley de Suelo y Rehabilitación Urbana — art. 27 (transmisión de fincas y deberes urbanísticos) and art. 28 (declaración de obra nueva), BOE-A-2015-11723
Ley Hipotecaria — arts. 20, 34 and 38 (fe pública registral and registered title)
Real Decreto 1093/1997, de 4 de julio — inscripción en el Registro de la Propiedad de actos de naturaleza urbanística, art. 52
Resolución de la Dirección General de Seguridad Jurídica y Fe Pública de 29 de junio de 2021, on the requirements for registering an extension declared by age
Regional planning legislation of each autonomous community, which sets the applicable limitation periods for enforcement action
Last reviewed: September 2026
This is general information on Spanish national law as it stood on that date, not advice on your specific property. Planning enforcement rules are regional and differ significantly between autonomous communities. If what you have read matches your situation, it deserves a proper conversation rather than an article.
Lawyer — ICAIB 5971, Ilustre Colegio de Abogados de las Islas Baleares
Written and reviewed personally — Estudio Legal Soria
despacho@estudiolegalsoria.es